Plan Test Case for Execution
Link Test Cases to a Test Cycle from Test Case Section
After creating the test cases, assign the test cases to test cycles (or test runs) of the same projects or different projects for execution. If you want to link test cases with test cycles from other projects, select and link test cycles from a single project at a time.
The system generates test reports based on the execution status and results.
Directly Link Test Cases to a Test Cycle
You can link selected test cases of a particular folder/root folder with one of the existing test cycles.
Perform the following steps to link test cases with test cycles:
1. Select test cases that you want to link to the existing test cycle. The count of selected test cases will be displayed above the grid.
If the Display Test Cases of Sub Folder(s) option is enabled on the tree, then the screen at right will include test cases of the parent folder as well as its sub-folders. So make sure you select only required test cases.
Select All:
Select all records on the current page:
Clicking on the check box in the column header selects all the records on the current page only.
An alternate way is to open the check box drop-down and select Current Page.
Select all records across all pages:
Open the check box drop-down and select the Across All Pages option.
Note: A maximum of 1000 test cases can be selected at a time.
The options for Bulk Operation start displaying on the screen on the selection of test case(s).
2. Open the Link With the drop-down menu and select the Link with Test Cycle option on it.
In the Executions tab, the Execution Fields icon changes to Green color :CustomFieldGreen: once the mandatory fields are filled.
Link Test Cases to a Test Cycle from Test Cycle > Test Case tab
Refer to Link Test Cases to a Test Cycle